District Annual Reports
At the beginning of every year, the Red Lake Watershed District produces a report on the activities of the previous year. These documents normally include information about the RLWD Board of Managers, the history of the RLWD, current staff members, water quality projects, engineering projects, permits, future plans, and financial records. Reports dating back as far as 1970 are available in the RLWD office in Thief River Falls. Annual Reports available in downloadable form are listed below as PDF files.
Annual Reports available for download:
- 2022 Annual Report
- 2021 Annual Report
- 2020 Annual Report
- 2019 Annual Report (PDF 19.3 MB)
- 2018 Annual Report (PDF 20.4 MB)
- 2017 Annual Report (PDF 18.2 MB)
- 2016 Annual Report (PDF 16.5 MB)
- 2015 Annual Report (PDF 21.1 MB)
- 2014 Annual Report (PDF 26.3 MB)
- 2013 Annual Report (PDF 22.2 MB)
- 2012 Annual Report (PDF 17.4 MB)
- 2011 Annual Report (PDF 21 MB)
- 2010 Annual Report (PDF 11 MB)
- 2009 Annual Report (PDF 12 MB)
- 2008 Annual Report (PDF 11.5 MB)
- 2007 Annual Report (PDF 9.66 MB)
- 2006 Annual Report (PDF 7.74 MB)
- 2005 Annual Report (PDF 19.1 MB)